EMC China Lab

Amazon Portable Power Station Direct Validation Guide

Views :
Update time : 2026-01-01

Urgent Alert! Amazon has recently issued a new compliance policy for portable power stations, officially marking the entry of this category into an era of stringent regULation!

 

Core Changes of the New Policy: The seller-uploaded test document requirement is abolished, and designated third-party Direct Validation is fully implemented. All in-stock and newly listed portable power stations must pass testing/validation by authorized institutions before they can be sold!

 

For sellers, although process restructuring is requiRED, this measure will eliminate market chaos in the long run and foster a fair competitive environment. This is also Amazon’s core consideration to safeguard consumer safety and enhance product reputation.

 

Amazon Portable Power Station Direct Validation Guide(图1)


What is Direct Validation?

Direct Validation is Amazon’s streamlined and reliable compliance system, with the core principle that sellers cooperate with Amazon-recognized TIC (Testing, Inspection and Certification) institutions, which oversee the entire process. Its key features are as follows:

① Mandatory Requirement: Products in designated categories must undergo testing/certification by Amazon-recognized TIC institutions, or existing reports must be submitted for validation.

② Direct Result Submission: TIC institutions submit test/validation results directly to Amazon.

③ Prohibition of Self-upload: Sellers are not allowed to upload compliance documents independently; the entire process is endorsed by third parties.

 

Key Compliance Requirements

First Step to Compliance: Clarify the Scope of Regulation!

Amazon defines the regulated scope as devices with built-in lithium batteries that can operate without a standard power supply.

Different products correspond to different standards, and accurate matching is critical!

1. Power Banks: Choose one of the three sets of standards

① ul 2056 (dedicated for lithium-ion power banks);

② IEC/UL/CSA 62368-1 + 62133-2;

③ IEC/UL/CSA 62368-1 + ul 2054.

2. Portable Outdoor Power Stations: Must meet this one mandatory standard

① ul 2743 (Safety Standard for Portable Power Packs) — no alternatives, compliance is mandatory!

3. General Mandatory Requirement: Applicable to All Categories

① un 38.3 (Lithium Battery Transportation Test): An internationally recognized standard to ensure transportation safety; it is a must-have requirement.

 

Already Have Test Reports from Other Laboratories? Here’s How to Proceed

If you already have test reports, follow these two steps:

1. Select an Amazon-recognized TIC institution and inform it of your existing reports.

2. Submit the reports to the TIC institution for evaluation to determine whether supplementary testing/audit is required.

Note: Direct Validation is a comprehensive compliance review that goes beyond report verification; all costs are borne by the seller.

 

4-Step Action Guide for Sellers: Achieve Efficient Compliance and Avoid Listing Removal

No need to panic! Follow these 5 steps for a smooth transition and efficient compliance:

Step 1: Conduct a Comprehensive Self-check and Identify Key ASINs

① Sort out all portable power station ASINs in your store and clarify the product types and corresponding compliance standards.

② Prioritize ASINs that have received testing requirements in the "Account Health" section to avoid overdue listing removal.

Step 2: Prepare Complete Documentation to Ensure Validity and Completeness

① Organize compliance documents for each ASIN: Core reports must be issued by ISO 17025-accredited institutions and remain valid within 12 months.

② Prepare UN 38.3 reports, BTS (Battery Test Summary) documents, and compliant graphic descriptions.

Step 3: Cooperate with a TIC Institution to Complete Validation

① Contact an Amazon-designated TIC institution and submit documents and samples to cooperate with the validation process.

② Prioritize service providers with a good reputation and high efficiency to avoid delays.

Step 4: Proactively Achieve Compliance to Prevent Unexpected Risks

① Even if no testing notice has been received, complete compliance preparations for all ASINs in advance.

② Amazon conducts regular inspections and random spot checks; proactive compliance helps avoid the risk of listing removal.

 

Compliance Shortcut: JJR Testing Empowers Efficient Solutions

For complex processes, turn to professional institutions to improve efficiency and reduce risks! JJR Testing (an Amazon-recognized TIC institution) provides full-process support:

① Accurately match applicable standards and assist in product type classification.

② Backed by ISO 17025 accreditation, issue compliant reports and support report evaluation and supplementary testing.

③ Offer full-process agency services, from document organization to direct result submission to Amazon, saving time and effort.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
2026 EU SVHC Candidate List (253 Substances) 2026 EU SVHC Candidate List (253 Substances)
02 .15.2026
2026 EU SVHC Update: 253 substances confirmed by ECHA. REACH SVHC testing per EU standard; fees from...
LFGB Certification Cost and Timeline Guide LFGB Certification Cost and Timeline Guide
02 .15.2026
LFGB testing ensures food-contact safety under German standards. JJR Lab offers LFGB tests from $398...
Bluetooth FCC Test Report Bluetooth FCC Test Report
02 .15.2026
Bluetooth FCC Test Report: JJR Lab offers FCC Part 15 Subpart C testing for Bluetooth devices. Items...
Is FCC Testing Required? Is FCC Testing Required?
02 .14.2026
FCC testing is required for products entering the U.S. Tests follow FCC Part 15, cover RF and EMC, w...
Where to Find FCC Test Reports Where to Find FCC Test Reports
02 .14.2026
Find FCC test reports via FCC ID search on the official FCC website, download compliance files, and ...
LFGB Compliance Testing for Plastic Food Contact M LFGB Compliance Testing for Plastic Food Contact M
02 .11.2026
LFGB compliance testing ensures plastic food contact materials meet German safety laws; JJR Laborato...
How to get LFGB Compliance Report for Food Grade P How to get LFGB Compliance Report for Food Grade P
02 .11.2026
Learn how to obtain an LFGB compliance report for food-grade products entering the EU market, with s...
LFGB Certification Process for Kitchenware Product LFGB Certification Process for Kitchenware Product
02 .11.2026
JJR LAB provides LFGB testing for kitchenware per German food contact standards, covering migration ...

Leave Your Message