  RCM (RegULatory Compliance Mark) certification is a unified certification mark used in Australia and New Zealand for electrical products, indicating that the product meets relevant safety and electromagnetic compatibility (EMC) requirements. Here is some basic information about the rcm certification timeline:
1. After obtaining safety certification (SAA certificate) and C-Tick/emc reports:
- With the local valid responsible supplier information, it takes approximately 1 to 2 weeks to complete the registration process and obtain a unique identification number starting with "N."
- Then, uploading each report usually takes around 7 business days.
2. For general low-voltage products:
- The RCM certification process typically takes 5 to 7 business days.
3. Special cases:
- For wireless products, it is necessary to follow ACMA regulations and provide RF+EMC CE reports for conversion certification.
- Products involving high voltage require special evaluation.
1. Preparation Phase: Obtain the necessary safety certification (saa certificate) and EMC reports.
2. Registration Phase: 1 to 2 weeks to complete the registration process and obtain the unique identification number starting with "N."
3. Report Upload Phase: About 7 business days.
4. Overall Timeline: For general low-voltage products, the certification process takes approximately 5 to 7 business days.
5. Special Products: The timeline for wireless products and other special cases may vary and require additional time for evaluation.
Please note that these timelines are for reference only and the actual duration may vary due to factors such as product characteristics, the efficiency of the certification body, and whether additional testing or document review is requiRED. For the most accurate time estimate, it is recommended to consult directly with the certification body or a professional RCM certification service provider.
China's JJR Laboratory offers RCM certification services and can help you save 40% on certification costs.
 What is the meaning of EMC?
   What is the meaning of EMC? 
           Why EMC Test Is Required?
   Why EMC Test Is Required? 
           What is the Difference Between EMI and EMC?
   What is the Difference Between EMI and EMC? 
           What is the difference between CE EMC and CE LVD?
   What is the difference between CE EMC and CE LVD? 
           What Is the EU WEEE for Electronic and Electrical
   What Is the EU WEEE for Electronic and Electrical  
           What Is the ASTM D4316-95(2016) Hot Water Bottle T
   What Is the ASTM D4316-95(2016) Hot Water Bottle T 
           Amazon Electric Massager UL1647 Test Report
   Amazon Electric Massager UL1647 Test Report 
           What Is IEC 60068-2-5:2018 Solar Radiation Test?
   What Is IEC 60068-2-5:2018 Solar Radiation Test? 
          24-hour online customer service at any time to respond, so that you worry!