EMC China Lab

How to get a Lighting UL Test Report?

Views :
Update time : 2025-02-20

As Amazon's strategic position in global commerce continues to rise, its entry requirements are becoming increasingly stringent. For example, lighting products listed on Amazon’s U.S. site require a corresponding ul report to prove product safety. If the ul test report is not provided within the required timeframe, the product may face suspension of sales or removal of the listing.

 

How to get a Lighting UL Test Report?(图1)


UL Test Standards for Lighting Products

1. LED Bulbs:

UL1993, UL8750

 

2. Fixed/Recessed LED Luminaires:

UL1598, UL8750

 

3. Portable LED Luminaires:

UL153, UL8750

 

4. Plug-in LED Night Lights:

UL1786, UL8750

 

5. High-Voltage Light Strings (with certified LED driver or direct mains connection):

UL588, UL2388

 

6. Low-Voltage Light Strings (without LED driver):

UL2108

 

7. Stage Lighting:

UL1573, UL8750

 

8. LED Driver:

UL8750

 

Required Documents for UL Test Report

If the power supply is certified:

1. Electrical parameters, function options, and description of differences

2. Engineering structure dimension drawings

3. Key component list

4. Labels and date codes

5. LED chip specifications

6. User manual

7. Circuit schematic, PCB layout, and component silk-screen diagram (for LED modules and non-Class 2 powered products)

 

If the power supply is not certified:

1. Electrical parameters, function options, and description of differences

2. Circuit schematic, PCB layout, and component silk-screen diagram (for power supply and LED modules only)

3. Engineering structure dimension drawings

4. Inductor and transformer specifications

5. Bill of Materials (BOM)

6. Key component list

7. Labels and date codes

8. LED chip specifications

9. User manual

 

Amazon UL Test Report Application Process

1. The applicant fills out the application form and provides the user manual and technical documents.

2. China JJR Laboratory determines the test standards, test items, and provides a quotation.

3. The applicant confirms the quotation, submits samples and related documents, and pays the certification fee.

4. Testing is arranged. Upon passing the tests, the applicant receives the UL test report.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
How Long Does It Take to Get an FCC ID for Wireles How Long Does It Take to Get an FCC ID for Wireles
04 .23.2026
FCC ID certification for wireless devices takes 1–4 weeks, covering standards like 47 CFR Part 15, P...
How much does FCC Part 15 certification cost in 20 How much does FCC Part 15 certification cost in 20
04 .23.2026
FCC Part 15 certification cost in 2026: SDoC from $400, FCC ID $1100–3500, with 1–4 week timelines. ...
Amazon France UIN Service Amazon France UIN Service
04 .22.2026
UIN is the key French EPR number to upload—not the certificate—to ensure compliance, avoid fees, and...
Italian Packaging EPR Service Italian Packaging EPR Service
04 .22.2026
Amazon Europe tightens Italy EPR rules—sellers must register, report, and manage product lifecycle c...
What is Amazon Italy EPR Compliance What is Amazon Italy EPR Compliance
04 .22.2026
Amazon Italy EPR Compliance means sellers must manage product lifecycle recycling under strict deadl...
What is Italy Packaging EPR? What is Italy Packaging EPR?
04 .22.2026
Italy Packaging EPR requires companies placing goods to register with CONAI, report data, pay recycl...
France EPR UIN Registration Detailed Explanation France EPR UIN Registration Detailed Explanation
04 .22.2026
JJR : France EPR UIN Registration mandatory: all sellers must register packaging, obtain UIN, label ...
German & French Packaging Laws Registration Re German & French Packaging Laws Registration Re
04 .22.2026
EU EPR mandates sellers in Germany and France to register and report packaging waste or face fines; ...

Leave Your Message