EMC China Lab

How to get a Lighting UL Test Report?

Views :
Update time : 2025-02-20

As Amazon's strategic position in global commerce continues to rise, its entry requirements are becoming increasingly stringent. For example, lighting products listed on Amazon’s U.S. site require a corresponding ul report to prove product safety. If the ul test report is not provided within the required timeframe, the product may face suspension of sales or removal of the listing.

 

How to get a Lighting UL Test Report?(图1)


UL Test Standards for Lighting Products

1. LED Bulbs:

UL1993, UL8750

 

2. Fixed/Recessed LED Luminaires:

UL1598, UL8750

 

3. Portable LED Luminaires:

UL153, UL8750

 

4. Plug-in LED Night Lights:

UL1786, UL8750

 

5. High-Voltage Light Strings (with certified LED driver or direct mains connection):

UL588, UL2388

 

6. Low-Voltage Light Strings (without LED driver):

UL2108

 

7. Stage Lighting:

UL1573, UL8750

 

8. LED Driver:

UL8750

 

Required Documents for UL Test Report

If the power supply is certified:

1. Electrical parameters, function options, and description of differences

2. Engineering structure dimension drawings

3. Key component list

4. Labels and date codes

5. LED chip specifications

6. User manual

7. Circuit schematic, PCB layout, and component silk-screen diagram (for LED modules and non-Class 2 powered products)

 

If the power supply is not certified:

1. Electrical parameters, function options, and description of differences

2. Circuit schematic, PCB layout, and component silk-screen diagram (for power supply and LED modules only)

3. Engineering structure dimension drawings

4. Inductor and transformer specifications

5. Bill of Materials (BOM)

6. Key component list

7. Labels and date codes

8. LED chip specifications

9. User manual

 

Amazon UL Test Report Application Process

1. The applicant fills out the application form and provides the user manual and technical documents.

2. China JJR Laboratory determines the test standards, test items, and provides a quotation.

3. The applicant confirms the quotation, submits samples and related documents, and pays the certification fee.

4. Testing is arranged. Upon passing the tests, the applicant receives the UL test report.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
What is RF Testing What is RF Testing
09 .09.2026
Wondering what is RF testing? JJR Laboratory provides expert radio frequency testing services to ens...
How to get MEID Address How to get MEID Address
09 .09.2026
Discover how to obtain your 56-bit Mobile Equipment Identifier (MEID). Learn its format, importance ...
How to get a MAC Address How to get a MAC Address
09 .09.2026
Learn how to obtain a MAC address for your network devices. JJR Lab provides expert IEEE MAC applica...
How to get an IMEI Number How to get an IMEI Number
09 .09.2026
Learn how to obtain an IMEI number for mobile devices with China JJR Laboratory. Understand the 15-d...
Hearing Aid Compatibility (HAC) Testing Hearing Aid Compatibility (HAC) Testing
09 .09.2026
JJR LAB provides expert Hearing Aid Compatibility (HAC) testing for mobile phones. We ensure your de...
Prop 65 Certificate of Compliance Prop 65 Certificate of Compliance
09 .09.2026
Obtain your Prop 65 Certificate of Compliance with JJR Laboratory. We provide expert California Prop...
What is the 16 CFR 1505 Test Standard? What is the 16 CFR 1505 Test Standard?
09 .09.2026
Ensure US electric toy safety and compliance with the 16 CFR 1505 test standard. JJR LAB provides ex...
What is Toy ASTM F963-23 Testing What is Toy ASTM F963-23 Testing
09 .08.2026
Ensure Amazon US toy compliance with ASTM F963-23 testing at JJR Lab. We provide CPSC-accepted lab r...

Leave Your Message