EMC China Lab

How to get a Lighting UL Test Report?

Views :
Update time : 2025-02-20

As Amazon's strategic position in global commerce continues to rise, its entry requirements are becoming increasingly stringent. For example, lighting products listed on Amazon’s U.S. site require a corresponding ul report to prove product safety. If the ul test report is not provided within the required timeframe, the product may face suspension of sales or removal of the listing.

 

How to get a Lighting UL Test Report?(图1)


UL Test Standards for Lighting Products

1. LED Bulbs:

UL1993, UL8750

 

2. Fixed/Recessed LED Luminaires:

UL1598, UL8750

 

3. Portable LED Luminaires:

UL153, UL8750

 

4. Plug-in LED Night Lights:

UL1786, UL8750

 

5. High-Voltage Light Strings (with certified LED driver or direct mains connection):

UL588, UL2388

 

6. Low-Voltage Light Strings (without LED driver):

UL2108

 

7. Stage Lighting:

UL1573, UL8750

 

8. LED Driver:

UL8750

 

Required Documents for UL Test Report

If the power supply is certified:

1. Electrical parameters, function options, and description of differences

2. Engineering structure dimension drawings

3. Key component list

4. Labels and date codes

5. LED chip specifications

6. User manual

7. Circuit schematic, PCB layout, and component silk-screen diagram (for LED modules and non-Class 2 powered products)

 

If the power supply is not certified:

1. Electrical parameters, function options, and description of differences

2. Circuit schematic, PCB layout, and component silk-screen diagram (for power supply and LED modules only)

3. Engineering structure dimension drawings

4. Inductor and transformer specifications

5. Bill of Materials (BOM)

6. Key component list

7. Labels and date codes

8. LED chip specifications

9. User manual

 

Amazon UL Test Report Application Process

1. The applicant fills out the application form and provides the user manual and technical documents.

2. China JJR Laboratory determines the test standards, test items, and provides a quotation.

3. The applicant confirms the quotation, submits samples and related documents, and pays the certification fee.

4. Testing is arranged. Upon passing the tests, the applicant receives the UL test report.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
Japan MIC Wireless Certification Testing Japan MIC Wireless Certification Testing
10 .13.2026
Complete guide to Japan MIC (TELEC/Giteki) wireless certification. Discover mandatory testing standa...
Canada RSS-247 Testing Lab Canada RSS-247 Testing Lab
10 .13.2026
JJR Lab: Expert Canada RSS-247 testing for WiFi, Bluetooth & IoT. Get fast ISED certification, I...
LVD and EMC Testing for Power Adapters LVD and EMC Testing for Power Adapters
10 .13.2026
Ensure power adapter compliance with JJR Lab‘s LVD and EMC testing. Discover essential safety standa...
IEC 62133-2 Lithium Battery Testing Laboratory IEC 62133-2 Lithium Battery Testing Laboratory
10 .12.2026
JJR Lab offers accredited IEC 62133-2 testing for lithium batteries and power banks. Get reliable IS...
EN 55032 and EN 55035 Testing Laboratory EN 55032 and EN 55035 Testing Laboratory
10 .12.2026
JJR Lab provides expert EN 55032 and EN 55035 EMC testing for multimedia equipment. Ensure CE compli...
FCC ID testing lab for Bluetooth earbuds FCC ID testing lab for Bluetooth earbuds
10 .12.2026
Looking for a Bluetooth earbuds FCC ID testing lab? Discover the US FCC certification process, Part ...
How to get an FCC ID and How Much Does It Cost How to get an FCC ID and How Much Does It Cost
10 .10.2026
Need FCC ID certification for US wireless devices? Discover the complete application process, testin...
What is the EN 300 328 Testing Standard What is the EN 300 328 Testing Standard
10 .10.2026
JJR Laboratory explains ETSI EN 300 328 V2.2.2, the EU RED standard for 2.4GHz devices (Wi-Fi, Bluet...

Leave Your Message