EMC China Lab

How to get a Lighting UL Test Report?

Views :
Update time : 2025-02-20

As Amazon's strategic position in global commerce continues to rise, its entry requirements are becoming increasingly stringent. For example, lighting products listed on Amazon’s U.S. site require a corresponding UL report to prove product safety. If the UL test report is not provided within the required timeframe, the product may face suspension of sales or removal of the listing.

 

How to get a Lighting UL Test Report?(图1)


UL Test Standards for Lighting Products

1. LED Bulbs:

UL1993, UL8750

 

2. Fixed/Recessed LED Luminaires:

UL1598, UL8750

 

3. Portable LED Luminaires:

UL153, UL8750

 

4. Plug-in LED Night Lights:

UL1786, UL8750

 

5. High-Voltage Light Strings (with certified LED driver or direct mains connection):

UL588, UL2388

 

6. Low-Voltage Light Strings (without LED driver):

UL2108

 

7. Stage Lighting:

UL1573, UL8750

 

8. LED Driver:

UL8750

 

Required Documents for UL Test Report

If the power supply is certified:

1. Electrical parameters, function options, and description of differences

2. Engineering structure dimension drawings

3. Key component list

4. Labels and date codes

5. LED chip specifications

6. User manual

7. Circuit schematic, PCB layout, and component silk-screen diagram (for LED modules and non-Class 2 powered products)

 

If the power supply is not certified:

1. Electrical parameters, function options, and description of differences

2. Circuit schematic, PCB layout, and component silk-screen diagram (for power supply and LED modules only)

3. Engineering structure dimension drawings

4. Inductor and transformer specifications

5. Bill of Materials (BOM)

6. Key component list

7. Labels and date codes

8. LED chip specifications

9. User manual

 

Amazon UL Test Report Application Process

1. The applicant fills out the application form and provides the user manual and technical documents.

2. China JJR Laboratory determines the test standards, test items, and provides a quotation.

3. The applicant confirms the quotation, submits samples and related documents, and pays the certification fee.

4. Testing is arranged. Upon passing the tests, the applicant receives the UL test report.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
FCC ID Certification Compliance Certificate FCC ID Certification Compliance Certificate
04 .30.2025
FCC ID certifies RF products meet U.S. standards for safety and interference. JJR Lab provides testi...
How many types of FCC certifications are there? How many types of FCC certifications are there?
04 .30.2025
FCC certification includes SDoC and FCC ID for electronic and wireless devices. JJR Lab provides tes...
Australia RCM LOGO Certification Australia RCM LOGO Certification
04 .30.2025
RCM certification combines safety & EMC for AU/NZ market access. JJR Lab provides testing to hel...
ANATEL Certification Process in Brazil ANATEL Certification Process in Brazil
04 .30.2025
ANATEL certification is required for telecom products entering Brazil. JJR Lab provides testing to e...
Faucet European Standard EN 817 Testing Faucet European Standard EN 817 Testing
04 .30.2025
JJR Lab provides faucet testing and certification according to European standards EN 817, EN 200, EN...
ISO 17025 Laboratory Test Report ISO 17025 Laboratory Test Report
04 .30.2025
Amazon product removals may occur due to missing ILAC ISO17025 reports or label issues. JJR Lab prov...
Temu Requires UN 38.3 Certification Temu Requires UN 38.3 Certification
04 .30.2025
TEMU requires UN 38.3 certification for battery transport. JJR Testing Laboratory offers professiona...
What is the Amazon ASTM F2057 Test Report? What is the Amazon ASTM F2057 Test Report?
04 .30.2025
The ASTM F2057-23 standard ensures safety for clothing storage units, focusing on stability, flammab...

Leave Your Message