EMC China Lab

How to Get a UL Test Report?

Views :
Update time : 2024-12-11

As Amazon's strategic position in global commerce continues to rise, products with electrical components listed on Amazon require relevant UL reports. A test report from a laboratory with ISO 17025 certification is required for normal sales and link restoration. If products purchased by competitors or customers lack relevant safety standard reports, they may engage a U.S. lawyer to send a letter to Amazon demanding the cessation of the sale of the company's products and initiate court procedures to destroy all the company’s products on Amazon. This could essentially mean the company is pushed out of the North American market. Many sellers have reported receiving such notifications, and their products have faced issues like suspension of sales or removal of listings due to failure to provide the ul test report within the stipulated time.

How to Get a UL Test Report?(图1)

Differences Between UL certification and UL Test Reports

- UL Certification: Voluntary certification that requires product testing and factory auditing, with quarterly audits. The process is expensive and time-consuming, and factory audits are very strict.

- UL Test Report: After testing a product according to the relevant UL standard and passing, a qualified test report is issued. This is cheaper, faster, and does not require a factory audit. It can be used for Amazon reviews but is invalid for customs clearance.

 

ul testing Standards

- Power Products: UL62368-1, ul1310, UL1012, ul2056, UL2089, UL458, UL697, UL60601-1

- IT/AV Products: UL62368-1

- Wireless Products: UL62368-1

- Lighting Products: UL1598, UL153, UL1786, UL1573, UL588, UL2108, UL924, UL1993, UL8750

- Battery Products: ul1642, ul2054, UL2056, UL2271, UL2580, UL1973, ul4200a

- Electric Vehicle Products: UL2849, UL2272

- Home Appliances: UI1007, UL1005, UL1028, UL1083, UL982, UL1026

- Industrial Transformers: UL1310, UL1012, UL506, UL1561, UL1562, UL1585, UL1876, UL1411, UL397, UL697

 

Materials Required for UL Test Report

1. Company information, including a copy of the business license (for first-time UL applicants).

2. Product description: product name, model, etc.

3. List of components: provide names, model numbers, rated values, and manufacturer information. If any components are ul certified, please indicate their UL file numbers. If a component has multiple suppliers, they can be listed together.

4. Performance and specifications: such as size, rated voltage, current, frequency, and power.

5. Structural or exploded diagram: Include a diagram of the product's structure with labels for each part to correspond with the component list.

6. Circuit schematic diagram: provide the electrical schematic, PCB schematic, and PCB layout.

7. Product photos, user manuals, safety instructions, installation guidelines, etc.

 

Process for Obtaining a UL Test Report

1. The applicant submits a request.

2. The applicant fills out the application form and provides the user manual and technical documents.

3. The testing standards and test items are determined, and a quotation is provided.

4. The applicant confirms the quotation and submits samples and relevant technical documents.

5. A fee notice is sent to the applicant, who makes payment based on the notice.

6. The product is tested.

7. If the product fails the test, the applicant is notified and allowed to improve the product. This process continues until the product passes the test. The applicant should modify the technical documents from the original application to reflect the changes made to the product.

8. Upon passing, the UL test report is provided to the applicant.

 

UL Test Report Timeline and Validity

- The UL test report takes 5-7 business days.

- If the UL testing standards used are not updated, the UL test report remains valid indefinitely.

 

Does UL Testing Require Factory Inspection?

- UL test reports do not require a factory inspection.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
What is IEC 62052 for Electrical Energy Measuring What is IEC 62052 for Electrical Energy Measuring
01 .28.2026
IEC 62052 sets general requirements & tests for AC energy meters. JJR provides CMS, CNAS, ISO/IE...
Australia LoRa Band 915-928 MHz RCM Compliance Australia LoRa Band 915-928 MHz RCM Compliance
01 .28.2026
Australia LoRaWAN 915–928 MHz full compliance: tested per AS/NZS 4268, CISPR32, 62368, 2772.2 by CMS...
What Are the Compliance Certifications for VHF Pro What Are the Compliance Certifications for VHF Pro
01 .28.2026
VHF compliance covers FCC, CE-RED, GITEKI, NCC and more, based on FCC Part 15/80/90 and ETSI standar...
Which Products Require WERCS Registration? Which Products Require WERCS Registration?
01 .28.2026
WERCS registration ensures compliance for products like chemicals and batteries, with standards, CMS...
Dustproof and Waterproof Ratings IP 54 / IP65 / IP Dustproof and Waterproof Ratings IP 54 / IP65 / IP
01 .28.2026
IP54/IP65/IP67 define dust- and water-protection levels under IEC 60529. JJR, a CMS, CNAS and ISO/IE...
SAR Standard Testing under the EU CE-RED Directive SAR Standard Testing under the EU CE-RED Directive
01 .28.2026
SAR testing under the EU CE-RED ensures wireless products meet safety limits. JJR, a CMS, CNAS and I...
Differences Between the Three EU Directives: LVD, Differences Between the Three EU Directives: LVD,
01 .28.2026
Focused on CE compliance, this summary covers LVD, EMC and RED differences, testing scope and risks,...
How to get CE Marking Certification? How to get CE Marking Certification?
01 .28.2026
Get CE Marking Certification via JJR: meet EMC, LVD, MD standards, tested by CNAS, ISO/IEC 17025 lab...

Leave Your Message