EMC China Lab

How to Get a UL Test Report?

Views :
Update time : 2024-12-11

As Amazon's strategic position in global commerce continues to rise, products with electrical components listed on Amazon require relevant UL reports. A test report from a laboratory with ISO 17025 certification is required for normal sales and link restoration. If products purchased by competitors or customers lack relevant safety standard reports, they may engage a U.S. lawyer to send a letter to Amazon demanding the cessation of the sale of the company's products and initiate court procedures to destroy all the company’s products on Amazon. This could essentially mean the company is pushed out of the North American market. Many sellers have reported receiving such notifications, and their products have faced issues like suspension of sales or removal of listings due to failure to provide the ul test report within the stipulated time.

How to Get a UL Test Report?(图1)

Differences Between UL certification and UL Test Reports

- UL Certification: Voluntary certification that requires product testing and factory auditing, with quarterly audits. The process is expensive and time-consuming, and factory audits are very strict.

- UL Test Report: After testing a product according to the relevant UL standard and passing, a qualified test report is issued. This is cheaper, faster, and does not require a factory audit. It can be used for Amazon reviews but is invalid for customs clearance.

 

ul testing Standards

- Power Products: UL62368-1, ul1310, UL1012, ul2056, UL2089, UL458, UL697, UL60601-1

- IT/AV Products: UL62368-1

- Wireless Products: UL62368-1

- Lighting Products: UL1598, UL153, UL1786, UL1573, UL588, UL2108, UL924, UL1993, UL8750

- Battery Products: ul1642, ul2054, UL2056, UL2271, UL2580, UL1973, ul4200a

- Electric Vehicle Products: UL2849, UL2272

- Home Appliances: UI1007, UL1005, UL1028, UL1083, UL982, UL1026

- Industrial Transformers: UL1310, UL1012, UL506, UL1561, UL1562, UL1585, UL1876, UL1411, UL397, UL697

 

Materials Required for UL Test Report

1. Company information, including a copy of the business license (for first-time UL applicants).

2. Product description: product name, model, etc.

3. List of components: provide names, model numbers, rated values, and manufacturer information. If any components are ul certified, please indicate their UL file numbers. If a component has multiple suppliers, they can be listed together.

4. Performance and specifications: such as size, rated voltage, current, frequency, and power.

5. Structural or exploded diagram: Include a diagram of the product's structure with labels for each part to correspond with the component list.

6. Circuit schematic diagram: provide the electrical schematic, PCB schematic, and PCB layout.

7. Product photos, user manuals, safety instructions, installation guidelines, etc.

 

Process for Obtaining a UL Test Report

1. The applicant submits a request.

2. The applicant fills out the application form and provides the user manual and technical documents.

3. The testing standards and test items are determined, and a quotation is provided.

4. The applicant confirms the quotation and submits samples and relevant technical documents.

5. A fee notice is sent to the applicant, who makes payment based on the notice.

6. The product is tested.

7. If the product fails the test, the applicant is notified and allowed to improve the product. This process continues until the product passes the test. The applicant should modify the technical documents from the original application to reflect the changes made to the product.

8. Upon passing, the UL test report is provided to the applicant.

 

UL Test Report Timeline and Validity

- The UL test report takes 5-7 business days.

- If the UL testing standards used are not updated, the UL test report remains valid indefinitely.

 

Does UL Testing Require Factory Inspection?

- UL test reports do not require a factory inspection.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
Guide to Compliance Certification for Projector Ex Guide to Compliance Certification for Projector Ex
07 .28.2026
Export projectors to the US seamlessly. JJR Lab provides expert compliance testing for UL62368, FCC,...
US Clothing 16 CFR 1610 Flammability Test + GCC + US Clothing 16 CFR 1610 Flammability Test + GCC +
07 .28.2026
Ensure US clothing export compliance! JJR Laboratory provides mandatory 16 CFR 1610 flammability tes...
Amazon US Button Cell Battery UL 4200A + 16 CFR 12 Amazon US Button Cell Battery UL 4200A + 16 CFR 12
07 .28.2026
Ensure Amazon US button battery compliance! JJR Laboratory provides mandatory UL 4200A and 16 CFR 12...
AliExpress US Site: Wireless Products Must Have FC AliExpress US Site: Wireless Products Must Have FC
07 .28.2026
From July 29, AliExpress US requires FCC-ID for wireless products. JJR Laboratory provides FCC testi...
EU CE LVD, EMC, and RED Directives for Electrical EU CE LVD, EMC, and RED Directives for Electrical
07 .28.2026
JJR Laboratory provides expert CE certification testing to LVD, EMC, RED, and RoHS standards, ensuri...
How to get a UL Test Certificate How to get a UL Test Certificate
07 .27.2026
Discover how to obtain a UL Test Certificate, applicable products, and testing standards. JJR LAB pr...
How to get a DOE Certificate of Compliance How to get a DOE Certificate of Compliance
07 .27.2026
Ensure US market entry with DOE certification! JJR Lab provides mandatory energy efficiency testing ...
California 65 Compliance Certificate California 65 Compliance Certificate
07 .27.2026
Need California Prop 65 compliance? JJR Lab provides expert product testing against OEHHA Safe Harbo...

Leave Your Message