EMC China Lab

Singapore IMDA Certification Label

Views :
Update time : 2025-08-20

According to the Infocomm Media Development Authority (IMDA) of Singapore, the IMDA Certification label is nota traditional graphic logo, but a mandatory text statement that must be clearly displayed on the device or related documentation. The following are the core requirements and operational guidelines:

 

Singapore IMDA Certification Label(图1)


Label Content Format

- Fixed Wording:Must state

`Complies with IMDA Standards XXXXXXXX`

`XXXXXXXX` refers to the registration code of a local Singapore telecom dealer (not a certificate number), which must be provided by an IMDA-licensed agent.

- Example:If the agent’s code is "123456AB", the complete label is:

`Complies with IMDA Standards 123456AB`.

 

Singapore IMDA Certification Label(图2)


Label Placement Requirements

The label must be clearly displayed in at least one of the following locations:

1. On the product itself (e.g., casing, bottom).

2. On the product packaging (box or label area).

3. In the user manual (cover page or compliance declaration section).

 

In special cases (e.g., very small devices), an electronic label (on-screen display) may be used instead of a physical label.

 

Size and Style Specifications

- Size:Strictly fixed at 17mm × 9mm (W × H), scaling is not permitted.

- Font & Color:No mandatory requirement, but the text must remain clear and legible (recommended: black text on white background, or white text on black background).

 

Risks of Non-Compliance

- Legal Penalties:Failure to label or incorrect label information may result in a fine of up to SGD 10,000 (approx. RMB 49,500) or imprisonment of up to 3 years.

- Market Consequences:Products may be removed from shelves, banned from sale, or detained during IMDA inspections.

 

Summary: Key Steps

1. Obtain Agent Code:Partner with a Singapore-registered telecom dealer to obtain their license number.

2. Generate Label:Create the label using the format `Complies with IMDA Standards [Code]`.

3. Placement:Apply the label on the product, packaging, or user manual, ensuring dimensions are exactly 17mm × 9mm.

4. Review:Include the label design in certification application documents.

 

> Note:The label does not require any graphic symbol; the focus is on the accuracy of the text statement and the agent’s code.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
What Does UL2056 Compliance for Amazon Power Banks What Does UL2056 Compliance for Amazon Power Banks
08 .20.2025
Amazon power banks must meet UL2056/DOE standards; China JJR Lab provides professional testing for U...
What Certifications Are Needed for Amazon Power Ba What Certifications Are Needed for Amazon Power Ba
08 .20.2025
JJR Lab provides testing and certification for power banks to meet UL, IEC, and BIS standards for sa...
What is the Amazon USA UL60950-1 Test Report? What is the Amazon USA UL60950-1 Test Report?
08 .20.2025
UL60950-1 test ensures IT power supply safety. JJR Lab issues CNAS-certified reports for adapters &a...
JATE Certification Test Items JATE Certification Test Items
08 .20.2025
JJR Lab offers JATE certification testing: core protocol compliance, RF, EMC, safety checks per MIC ...
How Much Does IMDA Certification Cost in Singapore How Much Does IMDA Certification Cost in Singapore
08 .20.2025
Singapore IMDA certification costs SGD 2.5k–10.5k incl. application, evaluation & local rep. JJR...
Singapore IMDA Certification Label Singapore IMDA Certification Label
08 .20.2025
Complies with IMDA Standards XXXXXXXX; JJR Lab provides testing per IMDA requirements, covering tele...
Taiwan NCC Certification Standards for Wireless Pr Taiwan NCC Certification Standards for Wireless Pr
08 .20.2025
Taiwan NCC wireless certification via JJR Lab: tests RF, EMC, SAR, OBW, spurious emissions, frequenc...
How Much Does NCC Certification Cost? How Much Does NCC Certification Cost?
08 .20.2025
NCC certification costs 70k–170k TWD; JJR Lab provides full testing: RF, EMC (if needed) per NCC sta...

Leave Your Message