EMC China Lab

EMC Testing for Communication Equipment

Views :
Update time : 2024-07-17

China JJR Laboratory is an IEC 17025 accredited lab. We provide the following product and standard testing services, assisting companies in obtaining FCC, CE, CCC, KC certifications, among others. We can help you save 20% on certification testing costs. Feel free to request a quote.

EMC Testing for Communication Equipment(图1)

Product emc testing:

- Switches, Routers, xDSL (ADSL/VDSL/PON/GPON), Edge Routers, Optical Transceivers, and Communication Base Stations

- Data Center Environmental Monitoring Equipment

- 2.4G WIFI/BT/Zibee/SRD/5G WIFI Wireless Products

- 2G/3G/4G/5G Wireless Products

 

emc testing Cycle:

- Approximately 7 working days

 

EMC Testing Items (Partial):

Communication Equipment: Switches, Routers, xDSL, Optical Transceivers, Base Stations, Data Center Monitoring Equipment

 

Test Items and Capabilities:

- Conducted Emission (CE), Conducted Immunity from RF Fields (CS): CISPR32/35, GB 9254

- Radiated Emission (RE), Power Frequency Magnetic Field Immunity (PFMF): en 55032/55035, GB 19286

- Electrostatic Discharge (ESD), Pulse Magnetic Field Immunity (PMF): ETSI 301 489 Series, YD/T 993

- RF Field Immunity (RS), Voltage Dips and Short Interruptions: EN 300386, GB/T 17626 Series

- Electrical Fast Transient (EFT), Voltage Variations Immunity (DIP): iec 61000 Series, GB 17625 Series

- Surge Immunity: ITU-TK.20/21

 

2.4G WIFI/BT/Zibee/SRD/5G WIFI Wireless Product Testing:

Test Items and Capabilities:

- Equivalent Isotropic Radiated Power, Adaptive: EN 300328, Article 2 Paragraph 1 Items 19 & 19-3-2

- Occupied Bandwidth, Accumulated Transmission Time: EN 301893, Xinbu No.[2002]353

- Power Density, Frequency Occupancy and Hopping Sequence: EN 300440, Xinbu No.[2002]620

- Unwanted Transmitter Spurious Emissions (Out-of-band), Hopping Frequency Separation: EN 300220, Xinbu No.[2002]277

- Unwanted Transmitter Spurious Emissions (Spurious), Sideband Spurious Emissions: EN 300330

- Receiver Spurious Emissions, Dynamic Frequency Selection (DFS): fcc Part15C

- Receiver Blocking: FCC Part15E

 

2G/3G/4G/5G Wireless Product Testing:

Test Items and Capabilities:

- UE Maximum Output Power, Spectrum Mask: 3GPP TS 38.521-1, IEEE Std. 1528:2013

- Maximum Power Reduction, Additional Spectrum Mask: 3GPP TS 38.521-3, IEEE Std. C95.1

- UE Additional Maximum Output Power, Adjacent Channel Leakage Ratio: 3GPP TS 51.010-1, EN 62209-1/-2/-3

- Configured Transmission Power, General Spurious Emissions: 3GPP TS 34.121-1, EN 50360

- Minimum Output Power, UE Coexistence Spurious Emissions: 3GPP TS 36.521-1, EN 50556

- Transmission On/Off Time Template, Additional Spurious Emissions: CFR 47, FCC Part 2.1091, EN 301511

- Absolute Power Control, Emission Intermodulation: CFR 47, FCC Part 2.1093, EN 301908-1/-2-13

- Relative Power Control, Reference Sensitivity: FCC Part2/22/24/27/90/95/101

- Total Power Tolerance, Maximum Input Level

- Frequency Error, Adjacent Channel Selectivity

- Transmission Modulation Quality, SAR

- Occupied Bandwidth


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
2026 UKCA Certification Guide 2026 UKCA Certification Guide
07 .08.2026
Secure 2026 UKCA certification with JJR LAB. We provide expert product testing to mandatory BS/BS EN...
Wireless Product Taiwan NCC Compliance Wireless Product Taiwan NCC Compliance
07 .08.2026
Ensure Taiwan NCC compliance for wireless products with JJR LAB. We provide expert EMC, RF, and safe...
RCM Approval for Electrical Products in Australia RCM Approval for Electrical Products in Australia
07 .08.2026
Ensure Australia RCM compliance for electrical products with JJR LAB. We provide fast testing to AS/...
Do I Need CPSC eFiling for Toys Do I Need CPSC eFiling for Toys
07 .07.2026
Starting 2026, CPSC requires eFiling for toy imports. Ensure compliance with CPSIA & ASTM F963. ...
What is the CPSC eFiling Requirement for Amazon Se What is the CPSC eFiling Requirement for Amazon Se
07 .07.2026
Amazon‘s CPSC eFiling deadline is July 8! Ensure your children‘s products meet ASTM & CPSIA stan...
What Products Require Direct Verification by Amazo What Products Require Direct Verification by Amazo
07 .07.2026
Ensure Amazon compliance with JJR LAB‘s TIC Direct Verification. We provide approved testing for UL,...
Amazon Toys TIC DV Validation Amazon Toys TIC DV Validation
07 .06.2026
Need Amazon Toys TIC DV Validation? JJR LAB offers direct reporting, ensuring laser, jewelry & s...
Austrian Amazon EPR Mandatory Compliance Austrian Amazon EPR Mandatory Compliance
07 .06.2026
Austrian Amazon EPR is mandatory for packaging, WEEE & batteries. Ensure products meet testing s...

Leave Your Message