EMC China Lab

10m EMC Chamber: The Cheapest Testing Cost

Views :
Update time : 2025-11-04

JJR's self-built 10-meter EMC chamber has completed construction and will be put into use! With this achievement, JJR becomes one of the few private third-party laboratories in China to possess both multiple 3-meter EMC chambers and a 10-meter EMC chamber laboratory.

 

JJR Media Spokesperson:

First, allow me to briefly introduce the 10-meter EMC chamber. As a company in the field of Electromagnetic Compatibility (EMC) testing in China, JJR has been dedicated to providing testing technology and equipment to global clients. The newly built 10-meter EMC chamber can meet the higher quality requirements of major brand manufacturers for their products.

 

In order to provide everyone with a more comprehensive understanding of this significant achievement, we have decided to hold an online media briefing. Now, I invite media reporters to ask questions.

 

Which brand built JJR's 10-meter EMC chamber?

The brand that built our 10-meter EMC chamber is ETS-LINDGREN.

 

 

What are the highlights of JJR's 10-meter EMC chamber?

Compared to earlier 10-meter EMC chambers, JJR's 10-meter EMC chamber has several advantages:

 

1. Water and oil routes are laid, enabling testing of equipment such as washing machines, toilet seats, and other devices requiring water supply and drainage.

2. Oil routes are laid, facilitating testing of industrial products with oil input and output.

3. Supports simultaneous testing with dual antennas.

4. Site compatibility with Radiated Susceptibility (RS), supporting AM 20V/m, PM 36V/m field strength interference.

5. Site compatibility for 1GHz-40GHz, enabling high-frequency radiation testing.

 

My product is a charging station, and some 10m sites cannot conduct tests. Can JJR accommodate it?

Some earlier constructed 10-meter chambers did not consider configurations for high-current power supplies due to developmental limitations at the time. JJR's 10-meter EMC chamber is equipped with a new energy product power supply system capable of accommodating high-current input. Our power supply configurations include:

 

- Single-phase 0-240V 20A variable frequency regulation

- Single-phase 0-240V 63A variable frequency regulation

- Three-phase 380V 200A, DC1000V 200A

 

We use the latest equipment, so you can rest assured that your product can be tested at our facility.

 

Why choose a 10-meter EMC chamber instead of a 3-meter EMC chamber?

There are several reasons:

1. Products larger than 2m cannot be tested in a 3-meter EMC chamber.

2. Some regulations require radiation testing below 30MHz to be conducted in a 10-meter EMC chamber, which a 3-meter chamber cannot fulfill.

3. Some industrial product regulations specify a 10m standard site, which a 3-meter EMC chamber cannot meet.

4. International certifications such as KCC in South Korea and bsmi in Taiwan continue to require testing in 10-meter EMC chambers.

 

Conclusion:

JJR's EMC laboratory in the South China region has established comprehensive Electromagnetic Compatibility (EMI, EMS) capabilities, including one 10m emc chamber, four 3m EMC chambers, five shielded rooms, and EMS anti-interference rooms. Among them, the 10m EMC chamber and a 9*6*6 room meet the emc testing requirements for medical equipment, with a maximum voltage and current of 380V/200A (three-phase) and 1000V/200 (DC), providing broad testing capabilities and accurate data for electronic manufacturers, offering complete CE, fcc, VCCI, and other national EMC regulations and pre-testing services.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
Terminal Block UL 1059 Certification and Testing Terminal Block UL 1059 Certification and Testing
08 .14.2026
JJR LAB offers expert Terminal Block UL 1059 certification and testing services. Ensure product comp...
Safety Capacitor UL 60384-14 Certification Test Safety Capacitor UL 60384-14 Certification Test
08 .14.2026
JJR Lab offers expert UL 60384-14 testing standard certification for safety capacitors. Ensure your ...
PTC/NTC Thermistor UL1434 Certification PTC/NTC Thermistor UL1434 Certification
08 .14.2026
Get UL1434 certification for PTC/NTC thermistors at JJR Lab. We provide expert testing to UL 1434 st...
Connector UL Certification Agency Connector UL Certification Agency
08 .14.2026
JJR LAB offers expert connector UL certification and testing (UL4128, UL1977, UL2238, UL6703) to ens...
What are the Compliance Requirements for Home Appl What are the Compliance Requirements for Home Appl
08 .13.2026
Ensure home appliance export compliance with JJR Lab. We offer expert guidance on global testing sta...
What is ITE Product Certification Testing What is ITE Product Certification Testing
08 .13.2026
What is ITE product certification testing? JJR LAB explains essential global testing standards to en...
2.4G WiFi Remote Control Toy Car CE RED (2014/53/E 2.4G WiFi Remote Control Toy Car CE RED (2014/53/E
08 .13.2026
JJR Laboratory provides CE certification for 2.4G WiFi remote control toy cars. We cover RED, EN71, ...
Textiles US California Proposition 65 Testing Textiles US California Proposition 65 Testing
08 .13.2026
JJR Lab provides expert US California Prop 65 testing for textiles. Ensure market compliance with st...

Leave Your Message