EMC China Lab

Power Supply Certification IEC 62619 Test Report

Views :
Update time : 2024-06-19

What are the test items for the IEC62619 test report? You can contact China JJR Testing Laboratory for details. Batteries and battery packs that comply with the IEC 62619 standard mainly include the following equipment:

- Stationary: Telecommunication base stations, Uninterruptible Power Supplies (UPS), energy storage systems, emergency power supplies, and similar applications.

- Motive: Forklifts, golf carts, Automated Guided Vehicles (AGV), rail and maritime use. (Excluding road vehicles)

 

Power Supply Certification IEC 62619 Test Report(图1)


Introduction to IEC 62619 Test Items

1. External short circuit test (cell or cell pack)

2. Impact test (cell or cell pack)

3. Drop test (cell or cell pack, and battery system)

4. Thermal abuse test (cell or cell pack)

5. Overcharge test (cell or cell pack)

6. Forced discharge test (cell or cell pack)

7. Internal short circuit test (cell)

8. Thermal propagation test (battery system)

9. Battery system safety (considering functional safety)

10. Battery Management System (BMS) or Battery Management Unit (BMU)

11. Overvoltage control (battery system)

12. Overcurrent control (battery system)

13. Overheat control (battery system)

 

Samples Required for IEC 62619 Standard

- Cells with IEC 62619 certification: 4 battery samples

- Cells without IEC 62619 certification: 4 battery samples + 26 cell samples

 

Documents Required for IEC 62619 Standard

1. Non-technical documents: Application form

2. Trademark authorization statement; Trademark declaration

3. Technical documents; Differences in various models, if any

4. Nameplate; Specifications; English user manual or installation manual

5. Key parameters confirmation form; Circuit diagrams/schematics

6. Printed Circuit Board (PCB) layout (trace layer and component layer)

7. cb certificate + report for the cell; List of structural materials (important component list)

8. Detailed parts list

9. Copies of important component certificates (e.g., VDE certificate, UL certificate, etc.); Specifications for protective components such as ICs and MOSFETs

10. ISO 9001 certificate; Functional safety-related documents

 

Feel free to contact China JJR Testing Laboratory to learn more about the details of the IEC 62619 testing and certification process.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
How to get the 16 CFR Part 1221 Test Report? How to get the 16 CFR Part 1221 Test Report?
06 .16.2025
16 CFR Part 1221 play yard testing ensures safety from falls, suffocation, and hazards. JJR Lab prov...
How to get a 16 CFR Part 1220 Test Report? How to get a 16 CFR Part 1220 Test Report?
06 .16.2025
16 CFR Part 1220 tests ensure non-full-size baby cribs meet strict safety standards. JJR Laboratory ...
How to get a 16 CFR Part 1219 Test Report? How to get a 16 CFR Part 1219 Test Report?
06 .16.2025
Get 16 CFR Part 1219 full-size crib test reports with JJR Lab—CPSC-accredited, ISO 17025 certified, ...
How to get a 16 CFR Part 1218 Test Report? How to get a 16 CFR Part 1218 Test Report?
06 .16.2025
Get 16 CFR Part 1218 bassinet safety testing per updated CPSC rules. JJR Lab provides certified, rel...
How to get a 16 CFR Part 1217 Test Report? How to get a 16 CFR Part 1217 Test Report?
06 .16.2025
JJR Lab provides professional certified testing for 16 CFR Part 1217, ensuring toddler beds meet US....
How to get a 16 CFR Part 1216 Test Report? How to get a 16 CFR Part 1216 Test Report?
06 .16.2025
Get 16 CFR Part 1216 test reports for infant walkers to meet US safety standards. JJR Lab offers cer...
How to get a 16 CFR Part 1215 Test Report? How to get a 16 CFR Part 1215 Test Report?
06 .16.2025
Need 16 CFR Part 1215 testing for infant bath seats? JJR Lab provides certified testing to ensure fu...
How to get a 16 CFR Part 1213 Test Report? How to get a 16 CFR Part 1213 Test Report?
06 .16.2025
Get 16 CFR Part 1213 bunk bed safety testing with JJR Lab—ensure full compliance with U.S. CPSC stan...

Leave Your Message