EMC China Lab

What are the requirements of UL 62368-1:2025?

Views :
Update time : 2026-03-15

What are the new requirements in the official release of ul 62368-1:2025?

Approved by the American National Standards Institute (ANSI), UL 62368-1:2025 Audio/video, information and communication technology equipment – Part 1: Safety requirements (4th edition) was officially issued and adopted as an American standard on July 31, 2025.

This standard is a supporting update to the international standard iec 62368-1:2023 (4th edition) and the European standard EN IEC 62368-1:2024 (4th edition), marking a comprehensive upgrade of the safety specification system for audio/video and information and communication technology (AV/ICT) equipment in the United States.

 

What are the requirements of UL 62368-1:2025?(图1)


Main Technical Updates

CompaRED with UL 62368-1:2019/R2021, this revision involves the following key clause updates:

1. Component Certification Requirements

Components/parts certified under the traditional standards iec 60950-1 (IT equipment) or IEC 60065 (audio/video equipment) will no longer be accepted. Manufacturers using components/parts certified under traditional standards must urgently review their BOM lists; it is expected that many components/parts from various manufacturers will require re-certification or replacement.

2. Coin Cell Safety Specifications

Updated structural requirements for coin cells, and added requirements from UL 4200a (Safety Standard for Products Containing Coin Cells).

3. Power Output Parameters

Updated relevant tables for external circuit requirements, revised the definitions of external circuit classification to align with IEC TR 62102, and also corrected the overvoltage values for different categories of external circuits.

4. Mechanical Structure Requirements

Updated requirements for openings in fire-resistant enclosures, mainly revising the dimensional requirements for side openings.

5. Wireless Charging Foreign Object Testing

Updated requirements for wireless charging foreign object testing, clarifying that the coils of the wireless charger and the charged product should be aligned or assisted in alignment at the center before testing, and added two test modes: Part A (power on first, then place foreign object) and Part B (place foreign object first, then power on).

6. Resistor Safety Protection

For fuse resistors used for safety protection in products, added the requirement that fuse resistors shall comply with IEC 60127-8.

7. Liquid-Cooled Component Requirements

Updated requirements for liquid-cooled components. For modular liquid cooling systems (LFC) with a capacity exceeding 1 liter, new requirements for leak detection, fluid compatibility, pressure relief, etc., have been established. Applicable to advanced cooling scenarios such as AI servers and high-performance computing equipment.

8. Battery System Requirements

Extensively updated requirements related to rechargeable lithium batteries. Added mandatory requirements for stationary lithium battery systems, covering non-portable equipment such as data center backup power supplies and large-scale energy storage devices. For batteries with segmented parameters, clearly added segmented testing, etc.

9. Requirements for Mesh/Grid Structure Equipment

For equipment with mesh/grid structures, equipment using breathable materials, and equipment covered with foam/fabric on the surface, added fire spread testing caused by external heat sources.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
2026 FCC Certification and Compliance 2026 FCC Certification and Compliance
03 .15.2026
AIoT growth makes FCC compliance critical for global sellers. Using FCC Part 15 and CE standards, JJ...
What are the requirements of UL 62368-1:2025? What are the requirements of UL 62368-1:2025?
03 .15.2026
UL 62368-1:2025 updates AV/ICT safety: new component certification, coin-cell protection, power limi...
Electric Bicycle Certification in New South Wales, Electric Bicycle Certification in New South Wales,
03 .15.2026
NSW phases e-bike and e-scooter battery rules: Feb 2025 meet AS/EN/UL standards; Aug 2025 approval r...
What is the European Accessibility Act (EAA)? What is the European Accessibility Act (EAA)?
03 .14.2026
What is the European Accessibility Act (EAA)? : EU law from 28 June 2025 requiring digital products ...
Compliance Guidelines for India IS/IEC 62368-1:202 Compliance Guidelines for India IS/IEC 62368-1:202
03 .14.2026
ndia Compliance Guidelines for IS/IEC 62368-1:2023 replace IS13252-1 and IS616 and include XR device...
16 CFR Part 1512 Compliance Testing Laboratory 16 CFR Part 1512 Compliance Testing Laboratory
03 .13.2026
US bicycle market entry requires 16 CFR Part 1512 compliance. JJR Lab, CPSC-accredited, provides tes...
Electromagnetic Compatibility and Interference Tes Electromagnetic Compatibility and Interference Tes
03 .13.2026
EMC testing ensures devices work without interference by checking EMI emissions and EMS immunity und...
What is 21 CFR Part 11 Compliance and Regulations What is 21 CFR Part 11 Compliance and Regulations
03 .13.2026
21 CFR Part 11 is an FDA rule defining how electronic records and e-signatures must be managed so th...

Leave Your Message