EMC (Electro Magnetic Compatibility) refers to the ability of a device or system to operate in accordance with requirements in its electromagnetic environment and not to produce intolerable electromagnetic interference to any device in its environment. Therefore, EMC includes two requirements: on the one hand, the electromagnetic interference generated by the device to the environment during normal operation cannot exceed a certain limit; on the other hand, it means that the device has a certain degree of immunity to the electromagnetic interference in the environment, that is, electromagnetic sensitivity. EMC certification is a directive on electromagnetic compatibility in CE certification.

product | Electromagnetic compatibility standards |
Information Technology ITE / Audio and Video Power Supply / Products | |
Lighting products | EN 55015 |
Home appliances | EN 55014-1 |
Industrial, scientific, medical products | EN 55011, |
Battery Products | EN 61000-6-1 |
Radiation (RE) 10m | Radiation (RE) 3m |
Radiated Immunity (RS) | Radiated Spurious Emissions (RSE) |
Conduction (CE) | Conducted Immunity (CS) |
Disturbance power (DP) | Three-loop antenna (3Loop) |
SURGE | Electrostatic Discharge (ESD) |
Electrical Fast Transient (EFT) | Voltage dips & short interruptions (DIP) |
Harmonic Flicker (H&F) Three-phase | Power frequency magnetic field (MS) |
Click |
1. Application ((1)Fill in the application form; (2)Provide information and send samples);
2. Quotation (Based on the information you provide, engineers will formulate the corresponding standards, test time and corresponding fees);
3. Payment (After the applicant confirms the quotation, sign the application form and service agreement and pay the fee);
4. Testing (The laboratory conducts a full set of tests on the applied products according to relevant EU testing standards);
5. Test passed and report completed;
6. Project completed and ce certificate issued.
Cycle: about 2 weeks. In special cases such as abnormal test, incomplete sample provision, etc., the corresponding time needs to be increased according to the actual situation.
Validity period: depends on whether the standard is expired. If the standard is expired, the certificate will also expire accordingly and re-certification is required.
7. Factory Inspection
No factory inspection required
EU CE/EMC certification |
| ·Test content: Electromagnetic compatibility |
Canadian Toy Testing
Australian Toy Testing | AS/NZS ISO 8124 Certifica
US Toy ASTM F963 Testing & CPC Certification
EU REACH Compliance Testing Service | SVHC Screeni
US Crib Testing | ASTM & CPSC Compliance
EU Compliance Testing for Cribs
EU GPSR Responsible Person Compliance Services
Do Sensors Need to Pass FCC Part 15.231 Certificat
24-hour online customer service at any time to respond, so that you worry!