EMC China Lab

Brazil ANATEL Mobile Phone Charger Testing Standard Act 5155/2024

Views :
Update time : 2025-09-22

On April 17th, ANATEL issued the new Act 5155, which outlines testing requirements for mobile phone chargers. This new act will come into effect on October 14, 2024, replacing Act 5159.

 

Brazil ANATEL Mobile Phone Charger Testing Standard Act 5155/2024(图1)


Here are the key changes in Act 5155:

1. ESD Levels for Car Chargers  

The new act improves the ESD (electrostatic discharge) requirements for car chargers. Specifically, ESD must now comply with ISO 10605/2008, section 8.3, with contact discharge set at 6kV (removing 2/4kV), and air discharge set at 8kV (removing 4/6kV).

 

2. Streamlined Surge and Transient Immunity Testing  

For car chargers, surge and transient immunity tests must now only be applied to pULses 2a, 3a, and 3b according to ISO 7637-2/2004, with the requirement for pulse 2b removed.

 

3. Safety Testing for Wall Adapters  

The new regulations mandate that safety testing be conducted on 22 adapter samples to ensure a stable evaluation process.

 

4. Size Testing for Wall Adapter Plugs  

Effective from January 1, 2025, adapters must demonstrate compliance with the size specifications in ABNT NBR NM 60884-1/2010, section 9.1 (Plugs and sockets for household and similar purposes) and Annex A of ABNT NBR 14136/2012 (Plugs and sockets for household and similar use in AC currents of 20A/250V). If manufacturers opt for testing under Act 5155, the size requirement will apply to chargers approved before January 1, 2025.

 

5. New Mechanical, Electrical, and Thermal Stress Testing for Wall Adapters  

Adapters must undergo 1,000 connection and disconnection cycles to check for any safety or functional degradation. After the cycles, they must withstand voltage (2000V) to test for leakage current. Chargers must endure mechanical tests, including free-fall, impact, compression, pulling, and wear tests, without safety-degrading damage.

 

6. Updates for Wall Adapters Used with Mobile Phones by October 14th  

All wall adapters for mobile phones must have their CoC updated to comply with the new Act 5155, undergoing new safety tests. Vehicle chargers tested under Act 5159 do not need to be retested during updates.

 

Source:https://sei.anatel.gov.br/sei/modulos/pesquisa/md_pesq_documento_consulta_externa.php?8-74Kn1tDR89f1Q7RjX8EYU46IzCFD26Q9Xx5QNDbqZLU9xv_l8FX5twd-7FgbPjND5G7NSXm7YtX9Gibv3FM-IBO-oSV-IvHWX5qO2qvJ2giDYwQLIIpNT2E0uLj86d

Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
2026 FCC Certification and Compliance 2026 FCC Certification and Compliance
03 .15.2026
AIoT growth makes FCC compliance critical for global sellers. Using FCC Part 15 and CE standards, JJ...
What are the requirements of UL 62368-1:2025? What are the requirements of UL 62368-1:2025?
03 .15.2026
UL 62368-1:2025 updates AV/ICT safety: new component certification, coin-cell protection, power limi...
Electric Bicycle Certification in New South Wales, Electric Bicycle Certification in New South Wales,
03 .15.2026
NSW phases e-bike and e-scooter battery rules: Feb 2025 meet AS/EN/UL standards; Aug 2025 approval r...
What is the European Accessibility Act (EAA)? What is the European Accessibility Act (EAA)?
03 .14.2026
What is the European Accessibility Act (EAA)? : EU law from 28 June 2025 requiring digital products ...
Compliance Guidelines for India IS/IEC 62368-1:202 Compliance Guidelines for India IS/IEC 62368-1:202
03 .14.2026
ndia Compliance Guidelines for IS/IEC 62368-1:2023 replace IS13252-1 and IS616 and include XR device...
16 CFR Part 1512 Compliance Testing Laboratory 16 CFR Part 1512 Compliance Testing Laboratory
03 .13.2026
US bicycle market entry requires 16 CFR Part 1512 compliance. JJR Lab, CPSC-accredited, provides tes...
Electromagnetic Compatibility and Interference Tes Electromagnetic Compatibility and Interference Tes
03 .13.2026
EMC testing ensures devices work without interference by checking EMI emissions and EMS immunity und...
What is 21 CFR Part 11 Compliance and Regulations What is 21 CFR Part 11 Compliance and Regulations
03 .13.2026
21 CFR Part 11 is an FDA rule defining how electronic records and e-signatures must be managed so th...

Leave Your Message