EMC China Lab

ISED Test Laboratory in China

Views :
Update time : 2024-07-19

Canadian Certification ICES/ised

IC stands for Industry Canada, similar to the fcc in the United States, and includes two types: IC-ID (ISED) and IC-sdoc (ICES). Since 2016, the original wireless equipment ic certification Number in Canada has been renamed to ised certification Number (Innovation, Science and Economic Development Canada (ISED)), but it remains the same on the label: IC:XXXXX-YYYYYYYYY. ICES certification is the passport for electronic and electrical products to enter the Canadian market. Products within the certification scope must pass certification to be sold in Canada.

 

ISED Test Laboratory in China(图1)


Differences Between ICES and ISED

PART 1: Applicable Products

IC-SDOC (ICES) applies to: General electronic products, such as power supplies, household appliances, and computer peripherals.

IC-ID (ISED) applies to: Wireless devices and telecommunications products.

 

PART 2: Different Documentation Requirements

IC-SDOC (ICES) Documentation Requirements:

1. Application form

2. Technical description or technical manual of the device model, internal operating frequency, circuit diagram, and user manual

3. Label

 

IC-ID (ISED) Documentation Requirements:

1. Product manual

2. Circuit diagram

3. PCB layout

4. Block diagram

5. Application form

6. Samples, etc.

 

PART 3: Different Standards

IC-SDOC (ICES) Standards: ICES-001, ICES-003, ICES-005

ICES-001: Industrial, Scientific, Medical

ICES-003: Information Technology (ITE) / Audio-Visual (AV) power supplies/products

ICES-003: Energy storage products

ICES-005: Lighting fixtures

 

Wireless Device IC-ID (ISED) Standards: RSS 247, RSS 248, RSS 210, RSS 216, RSS 132, RSS 133, RSS 130, RSS 139, RSS 199

 

PART 4: Different Timelines and Costs

IC-SDOC (ICES) Timeline: 7 working days

IC-ID (ISED): About 3 weeks once all documentation is complete.

Costs are determined based on the product, and IC-ID costs are based on the wireless module of the wireless device.

 

PART 5: Different Certification Processes

IC-SDOC (ICES): Contract signing → Samples + documentation → Testing → Draft certificate report → Draft confirmation → Certificate issuance

IC-ID (ISED): Contract signing → Samples + documentation → Third-party authorized lab testing → Draft report → Formal test report submission to institutions (such as FCB) for review → Certificate issuance

 

China JJR Laboratory is an IEC 17025 authorized lab, offering ISED certification testing services. Located in China, we can help companies save 30% on certification testing costs.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
What is 21 CFR Part 11 Compliance Certification? What is 21 CFR Part 11 Compliance Certification?
06 .01.2026
What is 21 CFR Part 11 Compliance Certification? Learn FDA requirements for electronic records and s...
Audio Video Equipment Testing Lab Recommendation Audio Video Equipment Testing Lab Recommendation
06 .01.2026
JJR Laboratory is an ISO/IEC 17025 accredited audio video equipment testing lab providing FCC, CE, I...
RCM Certification Process & Costs for Panorami RCM Certification Process & Costs for Panorami
05 .30.2026
RCM certification for panoramic cameras (AU/NZ) by China JJR LAB: safety, EMC & RF tests (AS/NZS...
Smart Watch Australia RCM Certification Smart Watch Australia RCM Certification
05 .30.2026
Smart Watch Australia RCM Certification by JJR Test Laboratory: EMC, RF & Electrical Safety test...
What is RCM Certification Electronic Products? What is RCM Certification Electronic Products?
05 .30.2026
RCM Certification mandatory for AU/NZ. JJR offers Safety, EMC, RF testing & EESS reg fees vary. ...
How much does RCM certification cost? How much does RCM certification cost?
05 .30.2026
RCM costs AUD 2,500–25,000+, covering Safety, EMC and RF tests. JJR provides RCM services at lower c...
CPSC eFiling Customs Clearance Guide CPSC eFiling Customs Clearance Guide
05 .26.2026
CPSC eFiling: US import filing by 2026-07-08. JJR Compliance Lab offers eFiling support, testing (AS...
US CPSC eFiling Electronic Filing Compliance Guide US CPSC eFiling Electronic Filing Compliance Guide
05 .26.2026
CPSC eFiling ACE mandatory Jul 8 2026 imports; JJR testing & cert service (fees apply); CPC/GCC ...

Leave Your Message