EMC China Lab

Physical Packaging Performance Testing Standards

Views :
Update time : 2025-02-07

1. Accelerated Aging (1 year)

- Testing Standard: YY/T 0681.1-2018, ASTM F 1980-16

- Duration: 4 weeks

 

Physical Packaging Performance Testing Standards(图1)


2. Vacuum Leak

- Testing Standard: ASTM D3078-02, GB15171

- Duration: 2 weeks

 

3. Dye Penetration

- Testing Standard: YY/T 0681.4-2010, ASTM F1929-2015

- Duration: 2 weeks

 

4. Seal Peel/Peel Strength

- Testing Standard: YY/T 0681.2-2010, ASTM F88-15

- Duration: 2 weeks

 

5. Microbial Barrier (Wet Method)

- Testing Standard: YY/T 0681.14

- Duration: 2 weeks

 

6. Sterility

- Testing Standard:

 - Chinese Pharmacopoeia 2020 Edition, Part IV, General Chapter (1101) Sterility Test

 - United States Pharmacopeia - National Formulary General Chapter <71> Sterility Test (Effective 2013)

- Duration: 3 weeks

 

7. Appearance (Visual Inspection)

- Testing Standard: YY/T 0681.11-2014, ASTM F1886/F1886M-16

- Duration: 2 weeks

 

8. Burst Test

- Testing Standard: YY/T 0681.3-2016, ASTM F1140/F1140M-13(2020)e1

- Duration: 2 weeks

 

9. Bubble Test

- Testing Standard: YY/T 0681.5-2010, ASTM F 2096-11

- Duration: 2 weeks

 

### Packaging Validation

 

10. Packaging Validation (1 Year, 1 Node, 1 Batch)

- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble

- Duration: 8 weeks

 

11. Packaging Validation (1 Year, 2 Nodes, 1 Batch)

- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble

- Duration: 8 weeks

 

12. Packaging Validation (1 Year, 2 Nodes, 3 Batches)

- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble

- Duration: 8 weeks

 

13. Packaging Validation (2 Years, 1 Node, 1 Batch)

- Includes: Accelerated Aging, Vacuum Leak, Dye Penetration, Seal Peel, Microbial Barrier (Wet Method), Sterility, Visual Inspection, Burst, Bubble

- Duration: 12.5 weeks


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
FCC ID Certification Compliance Certificate FCC ID Certification Compliance Certificate
04 .30.2025
FCC ID certifies RF products meet U.S. standards for safety and interference. JJR Lab provides testi...
How many types of FCC certifications are there? How many types of FCC certifications are there?
04 .30.2025
FCC certification includes SDoC and FCC ID for electronic and wireless devices. JJR Lab provides tes...
Australia RCM LOGO Certification Australia RCM LOGO Certification
04 .30.2025
RCM certification combines safety & EMC for AU/NZ market access. JJR Lab provides testing to hel...
ANATEL Certification Process in Brazil ANATEL Certification Process in Brazil
04 .30.2025
ANATEL certification is required for telecom products entering Brazil. JJR Lab provides testing to e...
Faucet European Standard EN 817 Testing Faucet European Standard EN 817 Testing
04 .30.2025
JJR Lab provides faucet testing and certification according to European standards EN 817, EN 200, EN...
ISO 17025 Laboratory Test Report ISO 17025 Laboratory Test Report
04 .30.2025
Amazon product removals may occur due to missing ILAC ISO17025 reports or label issues. JJR Lab prov...
Temu Requires UN 38.3 Certification Temu Requires UN 38.3 Certification
04 .30.2025
TEMU requires UN 38.3 certification for battery transport. JJR Testing Laboratory offers professiona...
What is the Amazon ASTM F2057 Test Report? What is the Amazon ASTM F2057 Test Report?
04 .30.2025
The ASTM F2057-23 standard ensures safety for clothing storage units, focusing on stability, flammab...

Leave Your Message