EMC China Lab

EMC Test Lab Canada

Views :
Update time : 2024-05-08

We understand that you are looking for an EMC (Electro Magnetic Compatibility) testing laboratory in Canada. However, we still want to help you understand us; because compared to local Australian laboratories, we can save you 30% on testing and certification costs.

 

JJRLAB is a Chinese EMC electromagnetic compatibility testing laboratory; we are an ISO/IEC 17025 and GLP laboratory. Welcome to learn more about us.

EMC Test Lab Canada(图1)

Radiated Emissions

(Radiated Emission )


Applicable standards

C1SPR1J、CISPR 14-1 x CISPR15、CISPR 16、CISPR32、IEC/EN 60601-1-2, IEC/en 61000-6-3/-4 、fcc part 15x ICES-003、EN 310489、EN 300386、EN 55011 、EN 55014-1、EN 55015、en 55032、GB/T 9254^ GB/T 13837、GB/T 17743、GB/T 17799.3/.4、GB 4343.1、GB4824、YY 0505


Measuring range

30MHz-40GHz


Main technical requirements of the site

Normalized site attenuation NSAW≤±4dB, site voltage standing wave ratio SVSWRW≤±6dB

Antenna height 1m-4m, turntable angle 0-360 degrees, ambient level at least 6dB lower than the limit

Shielding Effectiveness SE:

0.014MHz-1 MHz >60dB

1MHz-1000Hz>90dB

1GHz-18GHz >80dB


Radiated immunity

(Radiated Immunity)

Applicable standards

IEC/EN 61000-4-3

GB/T 17626.3


Measuring range

80MHz-6GHz 10V/m


Main technical requirements of the site

At least 75% of the 16 points of site uniformity are between 0-6dB


Conducted emissions

(Con ducted Emission)


Applicable standards

CISPR 11, CISPR 14-1、CISPR 15、CISPR 16、CISPR 32、IEC/EN 60601-1-2. IEC/EN 61000-6-3/-4、FCC PART 15x ICES-003、EN 310489、EN 300386、EN 55011、EN 55014-1、EN 55015、EN 55032、GB/T 9254、GB/T 13837、GBAT 17743、GB/T 17799.3/.4、GB 4343.1、GB 4824、YY 0505


Measuring range

150kHz-30MHz (power supply side, power borrowing side)


Main technical requirements of the site

LISN grounding resistance is less than 2.5mΩ 

The ambient level is at least 6dB below the limit



Harmonic Current Emissions 

Voltage Fluctuations and Flicker


Applicable standards

IEC/EN 61000-3-2、GB 17625.1

IEC/EN 61000-3-3、GB 17625.2


Measuring range

1-40th harmonic

Pst-10Min, Plt-2H


Main technical requirements of the site

Test voltage within ±2%

The total harmonic distortion of the power supply voltage is less than 3% 

The current accuracy is above ±1% and the measured phase angle error does not exceed ±2.


Electrostatic discharge immunity

(Electrostatic Discharge Immunity )


Applicable standards

IEC/EN 61000-4-2、ISO 10605

GB/T 17626.2、GB/T 19951

AEC-Q100-002-Rev.D Jul.2003 ESDA ANSI/EOS/ESD-SIM5.1 -2001 IEC61340-3-1 Ed1.0 2002、IEC 60749-26 Ed1.0 2003、JEDEC JESD22-A114C Jan.2005 、JEITA EIAJ ED-4701/300 Aug.2001、JEDEC JESD22-A115A


Measuring range

Finished product ±30KV

Module ±8KV


Main technical requirements of the site

470KΩ resistors at both ends of the coupling plate and the ground reference plane

Temperature: 15℃-35℃: humidity 30%RH-60%RH, atmospheric pressure 86kPa-106kPa

Voltage polarity: positive, negative

Duration: no less than 5S

Discharge mode: single, continuous


Electrical fast pulse group interference

(Electrical Fast Transients Immunity )


Applicable standards

IEC/EN 61000-4-4

GB/T 17626.4


Measuring range

±5.5KV (power supply, signal end)


Main technical requirements of the site

Polarity: positive, negative

Output type: coaxial output, 50Ω

DC blocking capacitor: 10 (1 ± 20%) nF 

Repetition frequency: 5&100 (1±20%) kHz

Pulse group duration: 15 (1 ± 20%) ms at 5kHz, 0.75 (1 ± 20%) ms at 100kHz

Pulse group period: 300 (1 ± 20%) ms


Lightning surge immunity

(Surge Immunity)


Applicable standards

IEC/EN 61000-4-5

GB/T 17626.5


Measuring range

±6.6KV (power supply end, multiple end)


Main technical requirements of the site

Polarity: positive, negative


Wavefront time

Open circuit: 10us±30%, 1.2us±30%

Short circuit: 8us±20%, 5us±20%


Half peak time

Open circuit: 700us±20%, 50us±20%

Short circuit: 20us±20%, 320us±20%

Phase angle: 0° -360°


Conducted Immunity

(Con ducted Immunity )


Applicable standards

IEC/EN 61000-4-6

GB/T 17626.6


Measuring range

150KHz-230MHz, 10V (power supply, signal)


Main technical requirements of the site

Polarity: positive, negative

Wavefront time

Open circuit: 10us ±30%, 1.2us±30% 

Short circuit: 8US±20%, 5US±20%

Half peak time

Open circuit: 700us±20%, 50us±20% 

Short circuit: 20us±20%, 320us±20%

Phase angle: 0° -360°



Power frequency magnetic field immunity

(Power Frequency Magnetic Field Immunity )


Applicable standards

IEC/EN 61000-4-8

GB/T 17626.8


Measuring range

Short-term 1000A/m, continuous 100A/m


Main technical requirements of the site

The EUT should be placed within a magnetic field uniformity space of ±3dB.

Continuous mode: 1A/m~100A/m, 3S-99999S

Short-time mode: 101A/m~1000A/m, 1s-3s

Additional current waveform distortion rate: <8%

Current waveform: 50Hz or 60Hz sine wave




Voltage drop, instantaneous interruption, and interference immunity

(Voltage Dips and Short Interruptions Immunity )


Applicable standards

IEC/EN 61000-4-11

GB/T 17626.11


Measuring range

0-100%


Main technical requirements of the site

The frequency of the power supply test voltage is within ±2% of the rated frequency.

When the generator carries 100 load, the actual voltage instantaneous peak overshoot/undershoot is less than 5%UT

When the generator carries 100 load, the voltage rise and fall time during the mutation process is 1us~5us

Phase change 0-360

The phase relationship between voltage sag and interruption and power frequency is less than ±100

Zero crossing control of generator ±100



DC voltage drop instantaneous interruption immunity

(DC-Voltage Dips and Short Interruptions Immunity )

Applicable standards

IEC/EN 61000-4-29

GB/T 17626.29


Measuring range

0-100%


Main technical requirements of the site

Output voltage range (Uo) ≤ 360V

Output voltage changes with load <5%

Ripple content < 1% of output voltage

When the generator is loaded with 100Ω, the overshoot/undershoot of the output voltage is less than 10% of the voltage change.

When the generator carries a 100Ω load, the voltage rise and fall time is 1us~50us

Output current (steady state) up to 25A


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
CE/RED/FCC Certification Testing of IoT Devices CE/RED/FCC Certification Testing of IoT Devices
07 .11.2025
JJR Lab offers CE/RED/FCC certification testing for IoT devices using LTE-Cat M/NB, ensuring network...
2025 Certification Guide for Exporting Electronic 2025 Certification Guide for Exporting Electronic
07 .10.2025
JJR Lab offers testing for 2025 export certifications like CE, FCC, CCC, PSE, and RoHS—ensuring elec...
From July 13, Amazon Accepts Only Compliant Lab Re From July 13, Amazon Accepts Only Compliant Lab Re
07 .10.2025
Starting July 13, Amazon only accepts reports from compliant labs. Use trusted labs like JJR to ensu...
What is KC EMC Certification? What is KC EMC Certification?
07 .09.2025
KC EMC certification ensures electromagnetic compatibility for electronics sold in Korea. JJR Lab pr...
KC Certification for Electronic Products KC Certification for Electronic Products
07 .09.2025
KC certification ensures electronic products meet South Korea’s safety and EMC standards. JJR Lab of...
Korea KC Mark Requirements Korea KC Mark Requirements
07 .09.2025
KC Mark is Korea’s mandatory safety certification. JJR Lab offers trusted testing for KC compliance ...
Introduction to EU EN 62368 Standard Introduction to EU EN 62368 Standard
07 .08.2025
EN 62368 is the EU safety standard for AV, IT & communication devices. JJR Lab provides testing ...
Electric Furnace CE Certification Testing Electric Furnace CE Certification Testing
07 .08.2025
Electric furnace CE testing covers LVD, EMC, energy efficiency, and RoHS compliance. JJR Lab provide...

Leave Your Message