EMC China Lab

Power Equipment EMC Testing

Views :
Update time : 2025-11-10

China JJR Laboratory is an IEC 17025 accREDited lab. We provide emc testing services for power equipment, assisting companies in obtaining fcc, CE, CCC, kc certifications, among others. We can help you save 20% on certification testing costs. Feel free to request a quote.

 

Power Equipment emc testing

Product Range:

- Voltmeters, Ammeters, Power Meters, Energy Meters

- Relay Protection Devices, InsULation Monitoring Devices

- Automatic Transfer Switch Equipment, Smart Inspection Robots

- Smart Inspection Drones

 

Testing Cycle:

- Approximately 7 working days

 

Testing Items:

- Conducted Emission (CE)

- Radiated Emission (RE)

- Electrostatic Discharge Immunity (ESD)

- Radio Frequency Radiated Immunity (RS)

- Electrical Fast Transient/Burst Immunity (EFT)

- Surge Immunity

- Conducted Immunity from RF Fields (CS)

- Power Frequency Magnetic Field Immunity (PFMF)

- Pulse Magnetic Field Immunity (PMF)

- Damped Oscillatory Magnetic Field Immunity (DOMF)

- Voltage Dips, Short Interruptions, and Voltage Variations Immunity (DIP)

- Ring Wave Immunity

- Harmonics, Interharmonics, and Low-Frequency Immunity on AC Power Ports

- 0Hz-150kHz Common Mode Conducted Disturbance Immunity

- Damped Oscillatory Wave Immunity (DOW)

 

Testing Standards:

- CISPR 11

- iec 61000-4-2/-3/-4/-5/-6/-8/-9/-10/-11/-12/-13/-16/-18

- IEC 61000-3-2/-3

- IEC 60255 Series

- GB 4824

- GB/T 17626.2/.3/.4/.5/.6/.8/.9/.10/.11/.12/.13/.16/.18

- GB 17625.1/.2

- GB/T 14598 Series


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
16 CFR Part 1512 Compliance Testing Laboratory 16 CFR Part 1512 Compliance Testing Laboratory
03 .13.2026
US bicycle market entry requires 16 CFR Part 1512 compliance. JJR Lab, CPSC-accredited, provides tes...
Electromagnetic Compatibility and Interference Tes Electromagnetic Compatibility and Interference Tes
03 .13.2026
EMC testing ensures devices work without interference by checking EMI emissions and EMS immunity und...
What is 21 CFR Part 11 Compliance and Regulations What is 21 CFR Part 11 Compliance and Regulations
03 .13.2026
21 CFR Part 11 is an FDA rule defining how electronic records and e-signatures must be managed so th...
2026 California Prop 65 Regulations and Warnings 2026 California Prop 65 Regulations and Warnings
03 .13.2026
California Prop 65 requires warnings if products expose listed carcinogens or reproductive toxins. T...
What are the export compliance for electric fans What are the export compliance for electric fans
03 .12.2026
Electric fan export compliance: EU CE (EMC/LVD, EN60335-2-80), RoHS, ERP EEI0.85; US UL507, FCC Par...
Amazon US Site Electric Fan UL507 Certification Amazon US Site Electric Fan UL507 Certification
03 .12.2026
Amazon US electric fans need UL507 certification before sale. Tests include leakage, grounding, temp...
What Certifications for Electric Fans in the EU &a What Certifications for Electric Fans in the EU &a
03 .12.2026
Electric Fan exports need UL1598/UL507 safety, DOE-CEC energy, FCC/FTC labels for the US; CE with EN...
How to Choose a Test Laboratory for Amazon UL 507? How to Choose a Test Laboratory for Amazon UL 507?
03 .12.2026
Choose an Amazon UL507 test lab with ISO17025/ILAC accreditation and full fan safety tests. JJR Labo...

Leave Your Message