EMC China Lab

How to get the UL1786 Test Report for Night Lights?

Views :
Update time : 2025-04-23

A night light is a small, low-power light source used to provide comfort or convenience in dimly lit indoor areas at night. Night lights are direct plug-in lights intended for indoor use in non-hazardous locations, with an input power not exceeding 10 watts.

 

It applies to fixtures with built-in ballasts for daylight and adapters for daylight lamps rated at 120V (including sockets for incandescent lighting fixtures and portable lamps). These devices may contain resistive, inductive, or electronic ballasts or power supplies and use various light sources, such as incandescent lamps, fluorescent lamps, night lights, HID, LED lights, and more.

 

UL1786 Policy

Amazon requires that all night lights be tested and comply with the following regulations, standards, and requirements:

Product | Regulations, Standards, and Requirements

Night light | One of the following options:

• UL 1786 or

• CSA C22.2 NO.256:14

 

Required Documentation

Product Page:

Model, part number or product number, manufacturer.

The age grading listed on the product detail page must match the age grading in the test report.

 

Documents:

A test report issued by a laboratory accredited under ISO 17025, proving the product's compliance with the above regulations, standards, and requirements.

 

The test report must include pictures of the product, demonstrating that the tested product matches the product listed on the product detail page.

 

Pictures:

Product labels, relevant safety information, compliance marks, hazard warnings, and views of the product or its packaging from all sides.

 

The pictures must demonstrate that the product matches the tested product and the product listed on the product detail page.

 

Product descriptions, manuals, safety information, labels, and warnings must be bilingual (English and French).

 

Model, part number or product number, manufacturer.

 

UL1786 Test Process

a) Fill out the application form;

b) Provide test samples and product information;

c) The JJR laboratory in China arranges testing;

d) Upon test completion, a draft report is issued;

e) After confirming there are no errors, the final report is arranged.

 

UL1786 Report Timeline

With complete documentation, the report is ready in 4-5 business days.


Email:hello@jjrlab.com


Leave Your Message


Write your message here and send it to us


Related News
Read More >>
FCC ID Certification Compliance Certificate FCC ID Certification Compliance Certificate
04 .30.2025
FCC ID certifies RF products meet U.S. standards for safety and interference. JJR Lab provides testi...
How many types of FCC certifications are there? How many types of FCC certifications are there?
04 .30.2025
FCC certification includes SDoC and FCC ID for electronic and wireless devices. JJR Lab provides tes...
Australia RCM LOGO Certification Australia RCM LOGO Certification
04 .30.2025
RCM certification combines safety & EMC for AU/NZ market access. JJR Lab provides testing to hel...
ANATEL Certification Process in Brazil ANATEL Certification Process in Brazil
04 .30.2025
ANATEL certification is required for telecom products entering Brazil. JJR Lab provides testing to e...
Faucet European Standard EN 817 Testing Faucet European Standard EN 817 Testing
04 .30.2025
JJR Lab provides faucet testing and certification according to European standards EN 817, EN 200, EN...
ISO 17025 Laboratory Test Report ISO 17025 Laboratory Test Report
04 .30.2025
Amazon product removals may occur due to missing ILAC ISO17025 reports or label issues. JJR Lab prov...
Temu Requires UN 38.3 Certification Temu Requires UN 38.3 Certification
04 .30.2025
TEMU requires UN 38.3 certification for battery transport. JJR Testing Laboratory offers professiona...
What is the Amazon ASTM F2057 Test Report? What is the Amazon ASTM F2057 Test Report?
04 .30.2025
The ASTM F2057-23 standard ensures safety for clothing storage units, focusing on stability, flammab...

Leave Your Message